Follow Us on Facebook

Get updates from FaveCrafts.com posted directly to your News Feed.

(3)

Bramble Cable Afghan

By: Joan Barnett for Red Heart Yarn

Rate This Article

Comment On This Article

Chunky cables and a unique bramble stitch border combine for an attractive knit afghan. Make this cable afghan knitting pattern from Red Heart Yarn in bright blue for a striking home accent.
 

Bramble Cable Knit Afghan

Afghan is 51½" x 69".

Materials:

  • Yarn: TLC® "Essentials™": 7 skeins 2820 Robin Egg.
  •  Knitting Needles: 5mm [US 8] – 40".
  • Cable needle, yarn needle.

GAUGE: 20 sts = 4"; 24 rows = 4" in Bramble Stitch. CHECK YOUR GAUGE. Use any size needles to obtain the specified gauge.

ABBREVIATIONS: dec = decrease; inc = increase;
K = knit; mm = millimeters; P = purl; St st = Stockinette
stitch (Knit on right side rows; Purl on wrong side rows.);
st(s) = stitch(es); tog = together; * or ** = repeat whatever
follows the * or ** as indicated; [ ] = work directions in
brackets the number of times specified.

 

Special Stitch:

BRAMBLE STITCH (multiple of 4 sts)
Row 1 (RS): P.
Row 2: * P3tog, (K1, P1, K1) in same st; repeat from *.
Row 3: P.
Row 4: * (K1, P1, K1) in same st, P3tog; repeat from *.
Repeat Rows 1-4 for pattern.

CABLE PANEL (worked over 19 sts)
Row 1 (RS): K6, P3, K1, P3, K6.
Row 2 and all WS rows: P6, K3, P1, K3, P6.
Row 3: Slip 3 sts to cable needle and hold in front, K3, K3
from cable needle, P3, K1, P3, slip 3 sts to cable needle
and hold in front, K3, K3 from cable needle.
Row 5: Repeat Row 1.
Row 6: Repeat Row 2.
Repeat Rows 1-6 for Cable Panel.

NOTE: Afghan is worked back and forth in rows. Circular
needle is used to accommodate the large number of
stitches.

THROW:

Cast on 258 sts.

Border – Row 1 (RS): Slip 1, beginning with Row 1, work
in Bramble st across to last st, K1.

Slipping first st and knitting last st of every row for
selvedge sts, work in Bramble st for 10 rows; end with a
WS row.

Begin Cable Center – Row 1 (RS): Slip 1, dec 3 sts
evenly spaced across row, work 20 sts in Bramble st; [work
10 sts in Reverse St st (P on RS rows, K on WS rows);
beginning with Row 1, work Cable Panel over 19 sts] 7
times; work 10 sts in Reverse St st, work 20 sts in Bramble
st, K1 – 255 sts.

Work as established until throw measures 67½”, inc 3
sts evenly spaced across last WS row – 258 sts. Slipping
first st and knitting last st of every row, work 10 rows in
Bramble st, end with a WS row.

Bind off. Weave in ends.

 

 

Newsletter Signup

Free Newsletter!

Discover crafting projects, free patterns, tips and special offers. Get free craft projects, how-to crafting tutorials & product reviews.

Please Wait

Thanks for signing up

Sorry, we could not sign you up.

Something worth saving?

Register now for FREE to:

  • SAVE all your favorite crafts
  • ADD personal notes
  • QUICKLY reference your crafts

 

Connect with Us

Find us online

Facebook Google Plus Twitter Pinterest Twitter Blog Email RSS

© Copyright 2013 Prime Publishing, LLC. All rights reserved.

www.favecrafts.com

[Alt-Text]